Skip to product information
Microstone Pool Base – Microstone pack

Microstone

Microstone Pool Base

Elastic Waterproof Mortar for Pools & Tanks

£190.00
Taxes included. Shipping calculated at checkout.
MS-POOLBASE-A-25
Component
  • Free deliveryon orders over £500
  • Price matchguarantee
  • Expert adviceavailable

Product description

Microstone Pool Base is a two-component, elastic waterproof mortar for swimming pools, water tanks and walls exposed to water. Applied in three thin coats with mesh, it forms the waterproof base that is then covered by the Microstone or Microforce pool finish.

Sold as two components: the 25 kg powder (Component A) and the 20 L liquid (Component B). Each 25 kg bag is mixed with 9 L of Component B, so one 20 L drum serves two bags.

Supplied by Microstone UK, Newcastle-under-Lyme. Contact us for stock and lead time.

How it's applied

  1. Prepare — flat, sound, clean substrate; cement bases fully cured (≥28 days). Repair defects with Innirepair.
  2. Mix — pour 9 L of Component B and slowly add the 25 kg powder until smooth and lump-free. Rest 5 minutes.
  3. Apply — three coats at minimum thickness with a steel trowel, mesh embedded in the middle of the coating. 4–5 hours between coats.
  4. Finish — cover with the final pool finish; wait at least 28 days before filling.

Avoid application with risk of rain, frost, strong wind or direct sun. For tanks in permanent contact with water, allow to dry fully (<4% moisture) and wash with hot water before use.

Key features

  • Waterproofs pool bases and water tanks
  • Elastic, crack-bridging — Class A5
  • Protects walls exposed to water
  • Bonds to concrete, precast concrete, render and ceramics
  • A1 euroclass fire rating

Technical information

Brand
Microforce (supplied by Microstone UK)
Product type
Two-component elastic waterproof mortar
Coverage
Up to approx. 6.8 m² per 25 kg bag mixed with 9 L of Component B
Dosage
25 kg Component A + 9 L Component B
Consumption
1.5–2 kg/m², depending on substrate
Thickness
2 mm per coat
Pot life
±60 minutes
Time between coats
4–5 hours
Overcoating
≥ 24 hours
Wait before filling
≥ 28 days
Direct tensile adhesion
±1 MPa
Crack resistance
Class A5
Permeability index
0.03 kg/m²·h⁰·⁵
Fire rating
A1 euroclass
Packaging
Component A 25 kg bag · Component B 20 L drum
Storage
1 year, sealed and protected from weather and humidity
Product codes
  • Component A – 25 kg powder MS-POOLBASE-A-25
  • Component B – 20 L liquid MS-POOLBASE-B-20L

Downloads

  • Product data sheetPDF – Manufacturer product data sheet Download

Delivery & returns